服务项目Service Items
High Tech Enterprise
National high-tech enterprise certification
Shenzhen High tech Enterprise Certification
Cultivation and storage of high-tech enterprises
ISO certification
ISO9001 quality management system
ISO14001 environmental management system
ISO45001/OHSAS18001 Occupational Health and Safety Management
ISO13485 Medical Device Management System
IATF16949/TS16949 Quality Management in the Automotive Industry
ISO20001 Information Technology Service Management
ISO22001 Food Safety Management System
ISO27001 Information Security Management System
SA8000 Social Responsibility Standard
GB/T23001 Integrated Management System
GB/T50430 Quality Management of Engineering Construction Enterprises
GB/T27922 Service Evaluation System
ROHS Raw Material Hazardous Substance Testing
QC080000 Hazardous Substance Detection
government funding
Shenzhen Municipal Government Project Funding
District level government funding
Private and small and medium-sized enterprise funding
Double Soft Enterprise Evaluation
Research and development funding
Intellectual Property Standardization
Intellectual Property Standardization Certification
Integrated Management System of Informatization
Product Certification
Qualification agency
National Industrial Production License Agency
Food Production License Agency
Construction industry qualification agency
Contract abiding and trustworthy enterprise
Medical Device Qualification Agency
Factory inspection coaching
Jesse Penny Factory Inspection
Carrefour Carrefour factory inspection
The general process of Carrefour Factory inspection is as follows:
1. Carrefour First Meeting of Carrefour Factory Inspection:
① Introduce the purpose, method, time arrangement, division of work, etc.
② Provide a list of documents and information to be reviewed
③ Explain the methods and requirements of worker interviews
④ Answer questions raised by factory representatives
2. Carrefour Carrefour Factory inspection Visit:
① Understand the basic situation of the factory, plant, number of people, dormitory, etc
Be familiar with the route and understand the key points
3. Carrefour Documents and records of Carrefour factory inspection:
(1) Various documents required (such as provisions prohibiting child Labour, provisions prohibiting discrimination, etc.)
② Check the records of 12 months, and the last 3 months must meet the requirements of the factory inspection
4. Carrefour Carrefour Factory inspection site inspection:
① Including production workshop, warehouse, dormitory canteen, toilet, doorman, medical room, etc.
② Focus on the three principles
③ Understand the production situation and record workers' activities on site
④ Take pictures if necessary
5. Interviews with workers of Carrefour Factory inspection:
① Random selection
② Suspicious age
③ Factory representatives are not allowed to participate and will be held in a separate room
④ It may be one to one or a group of one to one
6. Carrefour Last Meeting of Carrefour Factory Inspection:
① Issue interim report to decide whether to recommend
②10 days to issue a formal report
③ Thanks for the cooperation of the factory
④ Answer the questions raised by the factory
Three of them. 4. 5 It is possible to do it simultaneously
Carrefour Factory inspection/Carrefour Factory inspection standard document list
Carrefour Factory inspection/List of documents usually to be prepared for Carrefour factory inspection:
1. Business license;
2. Quality system certification;
3. Organizational chart;
4. Quality manual;
5. Program files;
6. Quality system internal audit plan;
7. Quality system internal audit records:
1) Internal auditor qualification certificate;
2) First and last meeting;
3) Check list;
4) Non-conformance report;
5) Internal audit report
8. Quality system management review plan
9. Quality system management review record:
1) Management review meeting minutes;
2) Management review report;
3) Follow-up records of resolution matters
10. List of main production equipment;
11. Equipment maintenance plan;
12. Equipment maintenance records;
13. List of instruments;
14. Instrument calibration plan;
15. Instrument calibration record:
1) Foreign school report;
2) Internal school personnel qualification certificate
3) Internal calibration procedures;
4) Internal school report
16. Annual training plan
17. Training records:
1) Sign up form;
2) Test volume
18. Quality control personnel pre-job qualification certification information (training and test records);
19. New product design and development data:
1) Product specifications;
2) BOM table (BOM);
3) Safety certification;
4) Sample test report
5) Trial production records;
6) Trial production evaluation report;
7) Work instructions;
8) Inspection standards;
9) FMEA analysis data;
10) Product quality control plan (QC engineering drawing).
20. Order review record;
21. New supplier qualification report
22. Existing supplier quality, delivery, price and service regular rating table;
23. Raw material purchase order;
24. Raw material specification acknowledgement
25. Incoming inspection operation instructions;
26. Incoming inspection standard;
27. Incoming inspection sample list and periodic evaluation record;
28. Incoming inspection record;
29. Record of handling unqualified incoming materials (including supplier's corrective and preventive action report);
30. Provision of raw material storage cycle;
31. Materials expired re-inspection records;
32. Control charts and out-of-limit processing records;
33. CPK Application Guide;
34. CPK measurement records and improvement records when the process capacity is insufficient;
35. Production operation instructions
36. Process inspection operation instruction;
37. Process inspection standards;
38. Process inspection record:
1) The first inspection record;
2) Inspection records;
3) Random inspection records;
39. Processing records of nonconforming products (including corrective and preventive action reports)
40. Statistical report of process inspection defects (weekly/monthly report, Pelatou);
41. Shutdown management regulations and records;
42. Work instructions for finished product inspection;
43. Finished product inspection standards;
44. Finished product inspection records;
45. Disposal records of unqualified finished products:
1) Rework and repair records;
2) Recheck records;
3) Corrective and preventive action report;
46. Finished product receipt
47. Product reliability and environmental test plans and records;
48. Data analysis procedures;
49. Quality objective statistics;
50. Customer communication information;
51. Procedures for handling customer complaints;
52. Customer complaint handling records;
For more information about Carrefour factory inspection, you can consult Tenglian consultant online. Shenzhen Tenglian Enterprise Management Consulting Co., LTD., established in 2005, is an old institution with independent legal personality in Guangdong Province. Specializing in ISO system certification, product certification, factory inspection counseling, high-tech enterprise identification, intellectual property implementation standards, government subsidy application, license agency and other qualification agents. Authoritative organization, experienced, full coaching. Senior certification counseling team, 15 years of experience, with exclusive approval channels, the pass rate is guaranteed! Since its establishment 15 years ago, it has served more than 7,000 enterprises and public institutions and government organizations.
Consulting telephone: 0755-27787866 13828761196 Mr. Chen
0755-27753399/19925332787 Miss Chen wechat consultation: tliso168